Resources utilization and productivity enhancement case studies / Anil Mital, Arunkumar Pennathur.

By: Contributor(s): Material type: TextTextSeries: Automation and control collectionPublisher: New York, [New York] (222 East 46th Street, New York, NY 10017) : Momentum Press, 2015Description: 1 online resource (xii, 113 pages) : illustrationsContent type:
  • text
Media type:
  • computer
Carrier type:
  • online resource
ISBN:
  • 9781606506806
Subject(s): Additional physical formats: Print version:: No titleDDC classification:
  • 658.4033 23
LOC classification:
  • T57.77 .M577 2015
Online resources: Available additional physical forms:
  • Also available in print.
Contents:
1. The case for simplifying the maintenance process through product design / Anoop Desai and Anil Mital -- 2. A disassembly algorithm to maximize resource utilization: a case study / Anoop Desai and Anil Mital -- 3. Standardization of technical data utilized for maintenance activities / Masaya Hagiwara -- 4. Allocation of nursing workforce in hospital wards with mix patient needs / Issachar Gilad and Ohad Khabia -- 5. Shelf management in apparel industry / Jung-Wook Lee, Yoon-Min Hwang, and Jae-Jeung Rho -- 6. Improving productivity in resource-constrained / Anil Mital and Arunkumar Pennathur -- Index.
Abstract: This book presents examples of engineering applications; particularly Industrial Engineering applications. Six distinct cases are included. The applications range from product design to quality control. The emphasis is on developing methodologies that can enhance utilization of resources. Case studies are important in demonstrating the use of engineering design principles and methodologies. The published literature, however, shows a paucity of cases that may be used for teaching and learning purposes. The reasons for a dearth of published case studies are many, including the propriety nature of problems and confidentiality of data. Such issues are further aggravated as many companies are self-insured and are reluctant to share information with outsiders.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
No physical items for this record

Includes bibliographical references and index.

1. The case for simplifying the maintenance process through product design / Anoop Desai and Anil Mital -- 2. A disassembly algorithm to maximize resource utilization: a case study / Anoop Desai and Anil Mital -- 3. Standardization of technical data utilized for maintenance activities / Masaya Hagiwara -- 4. Allocation of nursing workforce in hospital wards with mix patient needs / Issachar Gilad and Ohad Khabia -- 5. Shelf management in apparel industry / Jung-Wook Lee, Yoon-Min Hwang, and Jae-Jeung Rho -- 6. Improving productivity in resource-constrained / Anil Mital and Arunkumar Pennathur -- Index.

Restricted to libraries which purchase an unrestricted PDF download via an IP.

This book presents examples of engineering applications; particularly Industrial Engineering applications. Six distinct cases are included. The applications range from product design to quality control. The emphasis is on developing methodologies that can enhance utilization of resources. Case studies are important in demonstrating the use of engineering design principles and methodologies. The published literature, however, shows a paucity of cases that may be used for teaching and learning purposes. The reasons for a dearth of published case studies are many, including the propriety nature of problems and confidentiality of data. Such issues are further aggravated as many companies are self-insured and are reluctant to share information with outsiders.

Also available in print.

Mode of access: World Wide Web.

System requirements: Adobe Acrobat reader.

Title from PDF title page (viewed on March 12, 2015).

There are no comments on this title.

to post a comment.