000 01756nam a2200397Ia 4500
001 0000172804
005 20171002063732.0
006 m o u
007 cr cn|||||||||
008 130315s2013 caua sb 000 0 eng d
010 _z 2013008044
020 _z0833079352 (pbk. : alk. paper)
020 _z9780833079350 (pbk. : alk. paper)
020 _z9780833080028 (ebook)
035 _a(CaPaEBR)ebr10744759
035 _a(OCoLC)852899342
040 _aCaPaEBR
_cCaPaEBR
050 1 4 _aUC46
_b.S26 2013eb
082 0 4 _a355.7068/1
_223
100 1 _aSamaras, Constantine.
245 1 0 _aObtaining life-cycle cost-effective facilities in the Department of Defense
_h[electronic resource] /
_cConstantine Samaras ... [et al.].
260 _aSanta Monica, CA :
_bRAND National Defense Research Institute,
_c2013.
300 _axix, 59 p. :
_bill.
504 _aIncludes bibliographical references.
533 _aElectronic reproduction.
_bPalo Alto, Calif. :
_cebrary,
_d2013.
_nAvailable via World Wide Web.
_nAccess may be limited to ebrary affiliated libraries.
610 1 0 _aUnited States.
_bDepartment of Defense
_xAppropriations and expenditures.
650 0 _aDefense contracts
_zUnited States
_xCost effectiveness.
651 0 _aUnited States
_xArmed Forces
_xFacilities
_xCosts.
651 0 _aUnited States
_xArmed Forces
_xFacilities
_xPlanning.
651 0 _aUnited States
_xArmed Forces
_xMilitary construction operations
_xCosts.
651 0 _aUnited States
_xArmed Forces
_xMilitary construction operations
_xPlanning.
655 7 _aElectronic books.
_2local
710 2 _aebrary, Inc.
856 4 0 _uhttp://site.ebrary.com/lib/daystar/Doc?id=10744759
_zAn electronic book accessible through the World Wide Web; click to view
908 _a170314
942 0 0 _cEB
999 _c161946
_d161946