000 03112nam a2200481 a 4500
001 ebr10723837
003 CaPaEBR
005 20180830115324.0
006 m eo d
007 cr cn |||m|||a
008 130626s2013 nyua foab 001 0 eng d
020 _a9781606497197 (electronic bk.)
020 _z9781606497180 (pbk.)
040 _aCaBNVSL
_cCaBNVSL
_dCaBNVSL
035 _a(OCoLC)851081557
050 4 _aTS178.5
_b.S526 2013
082 0 4 _a670.427
_223
100 1 _aShaaban, Sabry.
245 1 0 _aProduction line efficiency
_h[electronic resource] :
_ba comprehensive guide for managers /
_cSabry Shaaban and Sarah Hudson.
250 _a2nd ed.
260 _a[New York, N.Y.] (222 East 46th Street, New York, NY 10017) :
_bBusiness Expert Press,
_c2013.
300 _a1 electronic text (xi, 103 p.) :
_bill., digital file.
490 1 _aSupply and operations management collection,
_x2156-8200
500 _aPart of: 2013 digital library.
504 _aIncludes bibliographical references (p. 97-100) and index.
505 0 _aList of illustrations -- Abbreviations and acronyms -- 1. Introduction -- 2. The unpaced production line -- 3. Unbalanced lines studied -- 4. Considerations in unbalancing your line -- Notes -- References -- Index.
506 1 _aAccess restricted to authorized users and institutions.
520 3 _aThis book covers the area of unpaced, unbalanced production lines. You will find an up-to-date discussion of how designing these lines can be made more efficient by taking advantage of inherent imbalance--for example, operators who work at different speeds--a concept that has traditionally been seen as an obstacle to efficient production. A series of experiments are presented to illustrate the issues involved in improving performance through production line imbalance. This is of interest to postgraduate and executive-level students interested in the area of production, and to managers of manual or semi-automated production lines who are interested in innovative approaches to line design. In this book you will find some surprisingly easy ways to improve performance with low or zero costs. Emphasis is placed on reducing the amount of time production lines lie idle, and on reducing work in process. This is a timely contribution to the field when managers are casting around for new ways to cut waste and reduce their use of natural resources.
530 _aAlso available in print.
538 _aMode of access: World Wide Web.
538 _aSystem requirements: Adobe Acrobat reader.
588 _aTitle from PDF t.p. (viewed on June 26, 2013).
650 0 _aAssembly-line balancing.
653 _aproduction line
653 _aunbalanced lines
653 _aidle time
653 _aaverage buffer levels
653 _aunpaced lines
700 1 _aHudson, Sarah.
776 0 8 _iPrint version:
_z9781606497180
830 0 _a2013 digital library.
830 0 _aSupply and operations management collection.
_x2156-8200
856 4 0 _uhttp://site.ebrary.com/lib/daystar/Doc?id=10723837
_zAn electronic book accessible through the World Wide Web; click to view
999 _c197583
_d197583